Northpoint Ventures · Bid Leveling · Sample deliverable

Bid Comparison: Roof Replacement, Harbor Glen Condominium

Fictional association: 3 buildings, 48 units, about 210 roofing squares (21,000 sq ft). Three bids received. Prepared for the Board of Directors.

1. Bottom line

The headline prices are ████████, ████████ and ████████, a spread of ███████. On the same scope, they land within ██████ of each other. Bid A looks cheapest because it leaves out work the other two include. The real choice is about warranty, insurance and contract terms, not price.

Recommendation: Bid B, with two negotiation points (section 7). It has the strongest warranty and insurance, a firm 60-day price, and holds back part of the payment until the work is done. Do not sign Bid A or Bid C as written.

2. Side-by-side line items (as bid)

Line itemBid A
████████████
PriceBid B
████████████
PriceBid C
████████████
Price
Tear-off and disposal1 layer only; 2nd layer extra███████Up to 2 layers███████Up to 2 layers███████
Underlayment30# felt, field only███████Synthetic, full coverage███████Synthetic + ice & water at eaves, valleys, penetrations███████
Shingles, installed (210 squares)Architectural, 30-yr limited████████Class 4 impact-rated architectural████████Designer architectural, lifetime limited████████
Flashing, drip edge, pipe bootsNew drip edge and boots; REUSES step flashing██████All new, incl. chimney counter-flashing███████All new███████
Ridge and ventilationNew ridge cap; existing vents reused██████Ridge vent + new box vents (balanced)██████Ridge vent + new box vents██████
Decking repair (rotted sheathing)EXCLUDED; ████ if found—Allowance: 40 sheets; overage ██████████EXCLUDED; time and materials—
Gutters and downspoutsExcludednot pricedExcludednot pricedNew gutters and downspouts included███████
Dumpsters and site protectionIncluded██████IncludedbundledIncludedbundled
Permit and inspectionsEXCLUDED—Included██████Included██████
Overhead and profitLump sum███████Lump sum███████Lump sum███████
TOTAL AS BID████████████████████████

3. Leveled to one reference scope

Reference scope used for all three: tear-off up to 2 layers; full synthetic underlayment with ice & water at eaves, valleys and penetrations; architectural shingle of at least 30 years with a manufacturer system warranty; all-new flashing; balanced ventilation; decking allowance of 40 sheets; permit and inspections; dumpsters and protection. Gutters are not part of this project. Adders are our estimates, shown so the Board can challenge them.
BidAdjustment to match reference scopeAmount
Bid A  ████████████Total as bid████████
2nd-layer tear-off allowance (210 sq x ████)██████
Synthetic underlayment upgrade (210 sq x ████)██████
Ice & water at eaves, valleys, penetrations██████
Replace reused step flashing██████
Balanced ventilation upgrade██████
Decking allowance, 40 sheets x ██████████
Permit and inspections██████
LEVELED TOTAL, Bid A████████
Bid B  ████████████Total as bid████████
Ice & water at eaves, valleys, penetrations██████
LEVELED TOTAL, Bid B████████
Bid C  ████████████Total as bid████████
Remove gutters (not in reference scope)████████
Decking allowance, 40 sheets x ████ (T&M estimate)██████
LEVELED TOTAL, Bid C████████
Risk range if sheathing damage is 3x the allowance (120 sheets instead of 40): Bid A adds ██████ at ███ per sheet; Bid B adds ███████ at ████ per sheet; Bid C adds about ██████ on time and materials, with no cap. Bid C also has a materials escalation clause that could add up to 5% (███████).

4. Scope gaps, exclusions and hidden costs

BidIssueWhy it matters
AExcludes decking repair (billed per sheet if found)Open-ended cost, usually discovered mid-job after the contract is signed.
AFelt underlayment, field only; no ice & water shieldLeaks at eaves and valleys are the most common failure point. The shingle warranty may require better underlayment.
AReuses existing step flashingOld flashing is where most leaks start. A new roof over old flashing can void the manufacturer warranty.
AExcludes permit; only 1 layer of tear-off pricedBoard pays for the permit separately. A hidden 2nd layer is an unpriced change order.
BDecking allowance 40 sheets, overage ████Fair structure, but the overage rate is above A's. Negotiate it down.
BGutters excludedFine for this scope, but the Board should decide separately whether to replace them.
CDecking repair on time and materials, no capNo ceiling on a cost that could be large.
CGutter replacement bundled inInflates the headline. Not in the reference scope, so we removed it from the leveled total.
CMaterials escalation clause over 5%; price good 15 daysThe price can rise after signing. Short validity forces a rushed vote.

5. Warranty, insurance and contract terms

TermBid ABid BBid C
Workmanship warranty2 years10 years10 years
Manufacturer warrantyShingle only; system warranty not offeredFull system warranty; contractor is a certified installerFull system warranty; certified installer
General liability$1M per occurrence; no umbrella$2M per occurrence + $5M umbrella$1M per occurrence + $2M umbrella
Workers' comp certificateNot providedAttachedAttached
Association named as additional insuredNot statedYesYes
Payment terms50% deposit, 50% at completion20% deposit, 60% progress, 20% retainage until final inspection40% deposit, 60% at completion
Price valid for30 days60 days15 days; escalation clause
ScheduleStart in 3 weeks, 3 weeks on siteStart in 6 weeks, 4 weeks on siteStart in 8 weeks, 4 weeks on site

6. Questions to ask each contractor

7. Recommendation

Bid B (████████████). Leveled price ████████ is within ██████ of the cheapest leveled bid (████████, Bid A) and buys a 10-year workmanship warranty instead of 2 years, a system warranty, higher insurance with the association named, a 60-day firm price, and 20% retainage until final inspection.

This is a comparison of the documents provided, built for board decision support. It is not legal, engineering or insurance advice. Figures come only from the bids supplied; adders are estimates for comparison. The Board should verify licenses, insurance certificates and warranty terms directly with each contractor and with the association's counsel or insurance agent. Northpoint Ventures · northpointvc@proton.me